Asset Management, Refurbishment and Maintenance Planning

Asset Management Projects

Project

Date

Client/Principal

Project Value

Water and Wastewater Asset Conditioning Monitoring Program, Brisbane Water. Preparation of RFP documentation for securing a Managing Consultant and panel of providers for asset condition assessment services across three main asset classes; pressure pipelines, M&E equipment and structures

May 2007

PB

 

Qld Treasury due diligence project for water reform program. Set up asset condition assessment methodology and performed detailed asset condition assessment of trunk mains and pump stations at Redlands, Brisbane, Maroochy and Logan Shires

July to Dec 2007

Cardno

 

Price Creek and Paddy’s Green pump stations asset renewals strategy and report

Jan to Jun 2007

SunWater

 

Sewer Rehabilitation Program, Brisbane, Brisbane Water. Assisting Brisbane Water to progress sewer rehabilitation program.

Projects to date include:

  • Inala outfall sewer rehabilitation (1km DN900);
  • 06/07 Trunk sewer rehabilitation (609m DN900, 241m DN525, 267m DN450, 141m DN375, 90m DN300);
  • Bedivere Street, Carindale emergency rehabilitation (155m DN450);
  • S18 sewer emergency rehabilitation (155m DN675);
  • Establishment of 5 year Panel (PSR) arrangement;
  • RFQ1 for PSR (1046m DN600, 574m DN525, 502m DN375, 190m DN300);
  • RFQ2 for PSR

August 2006, ongoing

 

 

 

 

 

 

PB

 

 

 

 

 

 

Total program >$40M

Lake Manchester pipeline condition &risk assessment, future use and remediation options

2006

PB

 

Burdekin Moranbah Pipeline asset hierarchy and attribute development

Nov 2006

SunWater

 

Paradise Dam Asset hierarchy development including asset attributes and maintenance planning

June 2006

SunWater

 

Development of SAP based asset management risk analysis and management process for SunWater

Mar2005

SunWater

 

Participation in managers study group to formalise and standardise asset management process for SunWater

2005

SunWater

 

Refurbishment of assets on Boondooma to Tarong pipeline three large pump stations

Feb 2005

SunWater

 

One of a panel of consultants doing detailed design for Brisbane Water’s water main replacement program. Design of replacement water and sewer mains for 30 projects including, field measurement and proofing of concept, detailed design and drafting

  • 2002/3 Financial Year - Fairlie Tce, Salisbury; Wanda Rd, Upper Mt Gravatt; Caswell St, East Brisbane; Bradshaw St, Kedron; Augustus St, Toowong;
  • 2003/4 Financial Year - George St, Brisbane; Quay St Brisbane; Adelaide St Brisbane; Colina St Wynnum; Coonan St, Indooroopilly; Burringbar St, Hemmant; Selina St, Wynnum; Pie St, Chermside; Muller Rd, Taigum; Fernvale Rd Tarragindi, Miles St Bald Hills
  • 2004/5 Financial Year – Arnold St & Wellington St ,Manly; Agnes St & Waterloo Pde, Wynnum; Akonna & Charlotte Sts, Wynnum; Calston St Oxley; Glen Retreat Rd Michelton; Grove St Albion.
  • 2005/6 Financial year – another seven projects

April 2003 to June 2006

Brisbane Water

Each project $5,000 to $12.000

Bucca Weir Inlet works technical investigation and asset renewal report

Jan 2005

SunWater

 

Elliot Irrigation system and river pump station condition assessment

Feb 2005

SunWater

 

Project management of Condition assessments for

  • Gin Gin irrigation area
  • Bingera irrigation area
  • Eton Irrigation Area
  • Isis Irrigation area
  • Mary valley scheme
  • Weemah area
  • Callide irrigation area

Aug 2003 to Sept 2004

SunWater

$250k

Lake Julius Maintenance Strategy and risk assessment

May June 2003

SunWater

 

Managed study of use of biodegradable oils and assisted with preparation of asset managers specifications on topic

Oct 2003

SunWater

 

Assessment of Blackwater pipeline river lift pumps and direction of rebuilding of pumps

May 2002

SunWater

 

Tarong water supply pipeline refurbishment work, surge tanks, consumer off-takes and above ground pipeline crossings.

Nov- Dec 2002

SunWater

 

Stanwell water supply pipeline engineering studies for pipeline pigging and pump performance. Design & procure new valves.

2001/2002

SunWater

 

Mt Alice pump station, replacement of valve actuators, detailed design and contract documents.

May 2001

SunWater

 

Stanwell water supply pipeline refurbishment, contract documents for pipeline CCTV inspection and subsequent lining repairs.

March 2001

SunWater

$1.2M

Project management of Tarong water supply pipeline condition assessment including provision of expert advice.

Aug 2000

SunWater

$300k

Project management of Awoonga Callide pipeline condition assessment including provision of expert advice on pipeline lining loss and pipe swabbing.

May 2000

SunWater

 

Stanwell water supply pipeline condition assessment expert advice.

March 2000

SunWater