Dalby Town Water supply augmentation, coal seam methane water supply pipeline, design philosophy, and hydraulic design |
Mar 2008 |
PB |
|
|
Wetalla to Acland pipeline hydraulic design, material selection, route selection and design of details of pipeline (scours, swabbing etc) |
Nov 2007 to present |
PB |
|
|
Mt Crosby East Bank raw water rising main surge analysis and fitting of protection devices. |
1998 |
Brisbane Water |
|
|
Mt Crosby West Bank pure water pump station reflux valve replacement project management and engineering. |
1998 |
Brisbane Water |
|
|
Second Party checking of Burdekin Moranbah pipeline hydraulic design. Detailing of pipeline valves and controls |
2005 |
SunWater |
$275M |
|
Redgate pipeline swabbing and ‘plumatella’ (pipe moss) infestation control. Design of swabbing installation, process and control, research into control/management of ‘plumatella’ |
Dec 2005 |
SunWater |
|
|
Design of new valve pressure equalising bypasses on Stradbroke Island main for Redland Shire. |
2001 |
Maunsell |
|
|
Heinemann Rd trunk main, detailed design and contract documents for Redland Shire. |
2000 |
Maunsell |
$1.5M |
|
Landsborough Effluent Trunk Main and pump stations, design of Stage 1 and 2 |
1999 |
Maunsell |
$650k |