Planning Reports

Water Supply and Waste Water Projects

Project

Date

Client/Principal

Project Value

Re-use of Fitzroy River Water Sewage Effluent at Stanwell Power Station Pre-feasibility Study, Stanwell, Queensland, Stanwell Corporation Limited and Fitzroy River Water

2007

PB

 

Acland Coal Mine Stage 3 Pre-feasibility Water Supply Study, Oakey, South-east Queensland, New Hope Coal.

2007

PB

 

Toowoomba Pre-feasibility Water Supply Study, Toowoomba, South-east Queensland, Department of Natural Resources, Mines and Water. Part of team responsible for preparation of options report on future water supplies for Toowoomba City and surrounding shires.

2007

PB

 

Toowoomba Pre-feasibility Water Supply Study, Wivenhoe Pipeline Scenarios, South-east Queensland, Department of Natural Resources, Mines and Water.

2006

PB

 

Wandoan Pre-feasibility Water Supply Study, Wandoan, Central Queensland, Xstrata. Prepared preliminary design and cost estimates for number of options to provide new coal mine at Wandoan with water from various sources

2007

PB

 

Cedar Grove Weir Business Case, Beaudesert, South-east Queensland, SEQWater. Undertook investigation of local and regional water supply issues including current and future demand, raw-water treatment requirements, and raw and potable water distribution requirements

2007

PB

 

Mount Isa Water Board, Loss management plan, assistance with early stages of planning

May 2006

BDR

 

Mount Isa City Council desktop water loss study. Program management, data analysis and reporting

Aug 2005

BDR

 

Mount Isa Water Board, Town common trunk main feasibility work

Aug 2005

BDR

 

Rosehill Sewage plant upgrade pre-feasibility study (Mt Isa)

Sept  2005

BDR

 

Dayboro water supply augmentation planning study. Detailed analysis and recommendations on multiple options for augmentation of Dayboro’s water supply

July 2005

PB

 

Preliminary design of MITR pump station, layouts, pumps, controls, storage requirements and disinfection system

June/Aug 2003

SunWater

 

Lake Moondarra and Mount Isa Terminal Reservoir Facilities Review and planning report for future expansion options

Dec to Mar 2003

SunWater

 

Mount Isa water supply system safe yield planning study and report.

May to November 2002

SunWater

 

Planning study and report on fast track option for Stag Creek Pipeline design and construction

May 2002

SunWater

 

Preliminary design, layouts and cost estimates for the Maryborough Effluent re-use scheme.

1999

Maunsell