Project |
Date |
Client/Principal |
Project Value |
|
Re-use of Fitzroy River Water Sewage Effluent at Stanwell Power Station Pre-feasibility Study, Stanwell, Queensland, Stanwell Corporation Limited and |
2007 |
PB |
|
|
Acland Coal Mine Stage 3 Pre-feasibility Water Supply Study, Oakey, |
2007 |
PB |
|
|
Toowoomba Pre-feasibility Water Supply Study, Toowoomba, |
2007 |
PB |
|
|
Toowoomba Pre-feasibility Water Supply Study, Wivenhoe Pipeline Scenarios, South-east Queensland, Department of Natural Resources, Mines and Water. |
2006 |
PB |
|
|
Wandoan Pre-feasibility Water Supply Study, Wandoan, |
2007 |
PB |
|
|
Cedar Grove Weir Business Case, Beaudesert, |
2007 |
PB |
|
|
Mount Isa Water Board, Loss management plan, assistance with early stages of planning |
May 2006 |
BDR |
|
|
|
Aug 2005 |
BDR |
|
|
Mount Isa Water Board, Town common trunk main feasibility work |
Aug 2005 |
BDR |
|
|
Rosehill Sewage plant upgrade pre-feasibility study (Mt Isa) |
Sept 2005 |
BDR |
|
|
Dayboro water supply augmentation planning study. Detailed analysis and recommendations on multiple options for augmentation of Dayboro’s water supply |
July 2005 |
PB |
|
|
Preliminary design of MITR pump station, layouts, pumps, controls, storage requirements and disinfection system |
June/Aug 2003 |
SunWater |
|
|
|
Dec to Mar 2003 |
SunWater |
|
|
|
May to November 2002 |
SunWater |
|
|
Planning study and report on fast track option for Stag Creek Pipeline design and construction |
May 2002 |
SunWater |
|
|
Preliminary design, layouts and cost estimates for the Maryborough Effluent re-use scheme. |
1999 |
Maunsell |
|