Project |
Date |
Client/Principal |
Project Value |
|
Western Corridor Pipeline Eastern Pipeline Alliance Augmentation stage 2, design of one large submersible pump station and three large (1.5MW) booster pump stations |
April 2008 ongoing |
SunWater |
|
|
Western Corridor Pipeline Eastern Pipeline Alliance general mechanical works, sampling systems, vacuum priming systems and minor works |
February 2008 to present |
SunWater |
|
|
Dalby Town Water supply augmentation, coal seam methane water supply pump station and pipeline, design philosophy, concept design, flow diagrams and hydraulic design. Methane gas engine driven pumps. Peer review of final design to come. |
Mar 2008 |
PB |
|
|
Wetalla Pump station. Design philosophy, hydraulic design, pump, valve and fitting specification for the pump station to supply the Wetalla Acland pipeline., |
Nov 2007 to present |
PB |
|
|
Calaqua L1 sewage pump station – correction of hydraulic design of intakes, refurbishment of pumps |
July 2007 to Feb 2008 |
Cardno |
$0.5M |
|
Boondooma Pump Station – design and specification of retro-fitted vacuum priming system |
Jun2007 |
SunWater |
|
|
Lead mechanical, reliability and hydraulic designer for Burdekin to Moranbah pipeline, 218km of DN750 pipe with one HV river lift and three HV high lift pump stations. Responsible for pump selection and pump station design, hydraulic design and valve selection for pipeline. Currently managing supply contracts, quality management and documentation of pipeline. |
Mar 2005 to Jan 2007 |
SunWater |
$20M |
|
Wentzell’s Rd pump station upgrade |
May 2005 |
SunWater |
$250k |
|
Refurbishment of Clare A pump station – Burdekin Irrigation Area |
Dec 2004 to Mar 2005 |
SunWater |
$200k |
|
Moodlu Quarry off-stream storage scheme including harvesting and return pumping stations and interconnecting pipeline, detailed feasibility, design and costing |
Aug 2004 |
PB |
$2.0M |
|
Design of pump stations for proposed Fitzroy to Gladstone pipeline (project abandoned) |
Jan Feb 2003 |
SunWater/ |
$20M |
|
Construction and commissioning supervision of Church Rd Pump Station |
May Dec 2003 |
Wernace Pty Ltd |
$300k |
|
Design of Church Rd Sewage pump station for Bellbowrie West development. |
Aug 2002 |
Wernace Pty Ltd |
|
|
Mt Crosby West Bank and North Pine supernatant water recycle pipelines and pump stations, design and construct. |
July to Dec 2002 |
Brisbane Water |
$0.5M |
|
Calaqua Railway towns sewerage scheme, detailed design of sewage pump stations including emergency storage sizing and contract documentation. |
2001 |
Maunsell |
$10M |
|
Calaqua Sewage pump stations D, E and F at Golden beach redesign to incorporate increased capacity and emergency storage. |
2000/01 |
Maunsell |
$500k |
|
Calaqua Sewage pump station K at King's beach, planning report and rising main assessment. |
2000 |
Maunsell |
$100k |
|
Mt Crosby East Bank Pump Station refurbishment and automation, mechanical, pump and pipework engineering. Refurbishment of twelve 900kW and four 1800kW pump motor sets, drive line-shafts, bearing cooling systems, ladders and platforms in deep wells. |
Oct 1996 to Oct 2000 |
Brisbane Water |
$13.5M |
|
Detailed design and specification of Coolum Sewage Pump Stations |
2000 |
Maunsell |
$400k |